


Perth - Western Australia's Sunniest Capital
Perth might be one of the most isolated cities in the world, with the Indian Ocean on one side and the Australian outback on the other, but that's part of its beauty. From its beaches to the gorgeous Victorian Gothic facade of its Town Hall to the timeless romance of the Art Deco era, Perth's architecture excites history buffs and design lovers.
Perth's isolation has never stopped it looking outward. Set between the Swan River and the Indian Ocean, the Western Australian capital combines Victorian and Federation-era landmarks with a bright modern skyline and an outdoor culture shaped by sun and water.
Our skyline brings together Governor Stirling Tower, Central Park Tower, Bankwest Tower and St Martins Tower, capturing some of the architecture and landmarks that make Perth unmistakable.
Crafted exclusively by Siluet‚ where cities become stories, and stories become home.
Enjoy free shipping on orders over AED 400.
Shipping and transit times will be calculated at checkout.
For orders placed before 14:00, same-day collection is available free of charge from our Studio in Dubai's Al Quoz Industrial Area 4.
Choose options



LEARN MORE ABOUT
Perth - City Silhouette


What is in the box
Your skyline, meticulously researched and hand-drawn by our team.
- MATERIAL: Recycled Acrylic
- THICKNESS: 6 mm - 1/4 inch for durability and visual depth
- INCLUDES: Pre-drilled mounting holes, matching wall nails and an installation guide.
- PACKAGING: All our products come in beautiful boxes.*
* We are updating our packaging, and your skyline may arrive in our previous box design.

Different sizes for different spaces
Our City Silhouettes are available in three sizes
- SMALL:
- Perfect for a gallery-style feature wall with various artworks. - MEDIUM:
- Ideal for living areas, offices or above the doorframe. - LARGE:
- Great for a feature wall, above a bed or larger spaces.
HOW TO INSTALL
Simple and Easy
Your skyline arrives with everything needed for immediate display:
• Pre-drilled mounting holes at optimal spacing
• Matching wall nails
Installation takes approximately 5 minutes, and no special tools are required.
Recently viewed products
FOR THE PETROL HEADS









